Announcements
9/22/2015
Design-Build Industry Forum Presentation
5/5/2015
Approved EA/FONSI/Section 4(f) Evaluation and Supporting Documents. [Environmental Assessment Documents]
Upcoming Meetings
No meetings are scheduled.
Public Hearing Documents
Title | Date | Download |
Public Hearing Documents | 5/2014 | View All |
Return to the main documents page
Design-Build Industry Forum
Title | Download |
Forum Presentation | Download |
Approved FONSI-EA-Section 4(f) Evaluation
Title | Download |
Assessment Appendix A - Planning Consistency Documentation | Download |
Assessment Appendix B - Water Quality Impact Evaluation | Download |
Assessment Appendix C - Park Land Deeds and Documentation of Significance | Download |
Assessment Appendix D - Standard Protection Measures | Download |
Assessment Appendix E - Comments & Coordination Report | Download |
Pensacola Bay Bridge FONSI-EA-Section 4(f) Evaluation (May 2015) | Download |
US Fish & Wildlife Service Biological Opinion
Title | Download |
US 98 Pensacola Bay Bridge Final BO 2015-04-08 | Download |
Preliminary Engineering Report (PER)
Title | Download |
PER - FINAL (May 2015) | Download |
PER Appendix A - Alts Considered (Concept Plans) FINAL (October 2014) | Download |
PER Appendix B - Preferred Alternative FINAL (October 2014) | Download |
PER Appendix C - Typical Section Package FINAL (October 2014) | Download |
PER Appendix D - Design Variation Package FINAL (October 2014) | Download |
PER Appendix E - LRE FINAL (October 2014) | Download |
PER Appendix F - Safety Analysis FINAL (October 2014) | Download |
PER Appendix G - Access Management Report FINAL (October 2014) | Download |
PER Appendix H - Utility Impact Assessment Report FINAL (October 2014) | Download |
Wetland Evalution & Biological Assessment Report (WEBAR)
Title | Download |
WEBAR Final (May 2015) | Download |
Essential Fish Habitat Assessment
Title | Download |
Essential Fish Habitat Assessment Final (May 2015) | Download |
Cultural Resources Assessment Survey
Title | Download |
Cultural Resources Assessment Survey (Dec. 2012) | Download |
Contamination Screening Evaluation Report
Title | Download |
Contamination Screening Evaluation Report (October 2012) | Download |
Conceptual Stage Relocation Plan
Title | Download |
Conceptual Stage Relocation Plan (Sept. 2013) | Download |
Noise Study Report
Title | Download |
Noise Study Report FINAL (July 2013) | Download |
Air Quality Technical Memo
Title | Download |
Air Quality Tech Memo FINAL (July 2013) | Download |
Pond Siting Report
Title | Download |
Pond Siting Report REVISED FINAL (February 2013) | Download |
Geotechnical Investigation
Title | Download |
Preliminary Roadway Soil Survey (August 2012) | Download |
Report of Geotechnical Investigation FINAL (July 2013) | Download |
Bridge Hydraulic Report
Title | Download |
Bridge Hydraulic Report & Appendices FINAL (August 2013) | Download |
Bridge Development Report (BDR)
Title | Download |
BDR (Volume I) FINAL (August 2013) | Download |
BDR (Volume II) FINAL (August 2013) | Download |